[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Apple II round crew updates - Part 3
- Subject: Apple II round crew updates - Part 3
- From: ahua10@aol.com
- Date: 1996/11/29
- Newsgroups: comp.sys.apple2
- Organization: AOL http://www.aol.com
Part 3
Know that with the peak of the Teminid showers over the Rottnest Island
of Western Australia on December 13, 1996 all that follows will be very
near to you. We are also in the process of increasing the electrical
conductivity of Earth's atmosphere in preparation for shutting down all
of your presently operating world-wide electrical grids before the
landings begin (it will not effect radios and TVs at the time of the
mass landing announcements). The purposes of these actions are two-fold:
First, we have to prepare your planet for our coming and also for its
graduation into full consciousness. Gaia is preparing to reset its
magnetic polarities as well as its declination points. These events need
rapid adjustments in the way Earth's atmospheric electrical grids are
placed. We have obliged the wishes of your Spiritual Hierarchy and done
so. Second, we will use these grids to broadcast electricity to you on a
temporary basis after the landings are completed (it will take about 3
to 7 days to give all households the new photon power generators and
then hook them up), and the old surface governments have finished their
surrender process (a period from one-half to one earth hour is allotted
for this process) after the landings are completed (it will take us four
and one-half hours for the entire landing procedure to be accomplished).
Moreover, we are in the process of adjusting your surface grids for the
arrival of the photon belt on December 31, 1996 (12 Oc, 18 Mol, 5 Eb).
This action will be partially completed by December 10, 1996 (12 Muluc,
17 Yaxkin, 5 Eb). The rest will be finished in the week before the first
photon belt arrives.
As a part of this process, we have opened the interdemensional landing
portal above the crater of Haleakala on the Island of Maui. This action
was done between the 19th and the 22nd of November (4 Lamat, 16 Xul, 5
Eb to 7 Batz, 19 Xul, 5 Eb). This portal will be used to bring in the
Sirian command ship and to set the coordinates for landing it in the
crater of Haleakala on the day of the landings. This large ship will
carry all important command personnel whose job it will be to coordinate
all Federation personnel (counsellors, scientists, technicians) after
the landings have been completed. It will land in the first ten minutes
of the landing operation in the first wave of ships.The Angelics have
also been busy with their work and have been adjusting the planet for
its rapid change in magnetics and gravity. After the graduation to full
consciousness, the planet will increase its gravitational pull by 1.95%.
Over the next two years,this change will allow Earth to gradually adjust
its orbit to a periodicity of 360 Earth days-lessening its periodicity
by only 0.13%. This slight change will permit the planet to return to
its normal orbit for the first time in nearly 11,400 years. It will also
allow the Spiritual Hierarchy to begin the activity of realigning the
orbits of the other inner planets so that the "life zone" of this solar
system can be successfully reestablished in its original form.
End of Part 3